Powercut at Grays Inn Road: 4/4/22
LiamFitz28 post_id=77398 time= user_id=1334 Wrote:Must be really bad for it to still not be working properly. I wonder what the issue is?
The biggedt issue when this sort of thing happens is that systems get powered down suddenly and then sometimes there are issues when they are brought back on afterwards. So possibly there's a bit of configuring, fixing or testing to do.

Also it's not necessarily that easy to just start again as normal from the normal place. Firstly there's the issue that some of their staff will be in the wrong place, they'll need to cover both Leeds and London at some point. But also operationally it takes a while to catch up too, they will have lost a day or two of the production workflow. Returning needs to be planned carefully


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)
Powered by MyBB, © 2002-2026 MyBB Group. Theme designed by m0ckingbird © 2015-2026.